![]() |
|||||||||||||||||||||||
|
DESIGN, AND CONSTRUCTION DOCUMENTS |
CONSTRUCTION ADMINISTRATION |
||||||||||||||||||||||
Pre-construction meeting with Owner and Contractor |
|||||||||||||||||||||||
Interview Owner to determine program needs |
|||||||||||||||||||||||
On-site observation of project during construction period |
|||||||||||||||||||||||
Site investigation to determine existing conditions and inventory existing materials and/or equipment to be relocated/reused |
|||||||||||||||||||||||
Review Contractor submittals of shop drawings, product selections |
|||||||||||||||||||||||
Prepare schematic design and present to Owner for approval |
|||||||||||||||||||||||
Monthly meetings with Owner and Contractor during construction period |
|||||||||||||||||||||||
Prepare detail drawings and specifications with periodic reviews by Owner for changes |
|||||||||||||||||||||||
Process Contractor Payment Requests |
|||||||||||||||||||||||
|
BIDDING
|
|||||||||||||||||||||||
Process final submittals including warranties, operator and maintenance manuals and as-built drawings upon completion of the project |
|||||||||||||||||||||||
Assist Owner in selection of qualified bidders |
|||||||||||||||||||||||
Bid analysis and contractor evaluation |
|||||||||||||||||||||||
|
|
|||||||||||||||||||||||
| MISSION | SERVICES | PROJECTS | |||||||||||||||||||||